Homeowners in Arroyo Grande were looking to upgrade their existing basement into a modern and comfortable granny flat. The existing 1,000 SF basement area contained two water heaters, half a bathroom and multiple vacant rooms. Artifex Industries saw the potential for this remodel and was ambitious to meet with the homeowners to discuss the layout of the updated flat. Starting construction in early February, the project is currently in the construction phase and is making timely progress. Here are some of the upgrades and features that Artifex Industries is adding into the upgraded flat:

  • Kitchen with Gas Stove, Refrigerator, Sink, Cabinets, etc.
  • Living Room
  • Full Bathroom
  • Master Bedroom
  • Stackable Washer/Dryer
  • Additional French Door
  • Additional Windows
  • Deck Patio

Before and After

The original basement area was mostly empty and only had the two water heaters, a sink, half a bathroom, and water/gas lines for the main residence. Currently, cabinets and many of the appliances are being installed to help create a stunning final product that the owners are sure to enjoy!

A Tour Throughout the Home